TOOLS & SERVICES
COMMISSIONING AND OPERATING THE EQUIPMENT
INSTALLING THE EQUIPMENT FOR LIQUID WASTE TREATMENT
The building of additional treatment infrastructure which may be needed to
connect at the sonochemical reactor, such us, for example, the installment of
clarifying or polishing equipment, subcontracting, and supplying.
Facility design which may include the design of liquid waste treatment plant to be
installed, and additional equipment such as those for sludge dewatering, and
waste disposal (customized).
INSTALLING SLUDGE TREATMENT EQUIPMENT
Additional treatment infrastructure and equipment that may be needed, such for
example, waste tanks, process control, conveyors, utilities, and the like.
On-site installation of equipment.
Optional: The client may decide to install his own sludge treatment facility or may
choose we treat the sludge
MANAGEMENT OF
Operational costs before and after commissioning, including process chemicals,
supplying, utilities, and the like.
Equipment Maintenance and Servicing after commissioning
COMMISSIONING
Project design validation
Guarantee over operation lifetime
Project design validation
Facility spec sheet and its technical documentation
Operational validation of facility by client
Produced water quality checked and validated
THE LAST-GENERATION TECHNOLOGY SOLUTIONS
FOR WASTE TREATMENT AND DISPOSAL
Green Water NanoTechnology
Find the right solution to your waste treatment
Tell us your needs and we will shape the right technology solution
to solve your waste problem